Total area:
Hull preparation area:
Stores and various service areas:
Number of employees:
Production capacities:
Steel:
Length of outfitting quay:
Building berth:
Pre-fabrication quays:
Number of floating docks:
Covered shipbuilding shops
Fully
equiped. Capacity:
Cranes:
Steel cutting
machines:
Design and
workshop drawings:
Production
planning and control:
Quality
management:
Environmental
management: |
70,200
m²
32,300 m²
16,100 m²
about 300
500,000 hrs/year
14,000 t/year
750 m
1 for ships up to 200 m length and 33 m breadth
= 50,000 tdw
No. 1
for ships and sections up to
50 m length and 14 m breadth
No. 2
for ships and secations up to
60 m length and 14 m breadth
No. 3
for ships and sections up to
60 m length and 80 m breadth
No. 4
for ships and sections up to
60 m length and 20 m breadth
No.1
for ships up to
85 m length, 12.64 m breadth and
3.6 m depth
Lifting capacity: 1,600 t
No. 2
for ships up to
165 m length, 25.40 m breadth and 6m depth
Lifting capacity: 10,000 t
100 - 450 t Volume Sections
12x with lifting capacity of 100 t
Three NC controlled per online
computer
25 specialists with CAD/CAM
equipment TRIBON / AutoCAD
4 specialists with integrated ERP system
DIN EN ISO 9001
DIN EN ISO 14001 |