Single decker "ELKE" at the LINDENAU Shipyard for repairs
In
February 2010 the 79.80m single decker „ELKE“ came to the
LINDENAU shipyard for the first time.
The ship was docked in
LINDENAU’s DOCK II where the ships propeller was exchanged.
The assignment including acceptance, inspection and approval tests was completed by the
LINDENAU repair team within four days.
ELKE left
LINDENAU’s dock on the 14th of February. The client is completely satisfied with the works carried out.